Report from CEPT to the European Commission in response to
Task 1 of the Mandate “Study and assess conditions to operate 5G non-AAS connectivity for MCA in the 1800 MHz (1710-1785 MHz and 1805-1880 MHz) frequency band” and
Task 2 of the Mandate “Study and assess whether, and under what conditions, the usage of an NCU in MCA operations could be made optional”